Reference: Manage Meter Charges Process Model - Page 1 for the associated business process diagram.Actor/Role: CC&BDescription: If eligibility requirements are met and the SP is not setup for Negative Consumption, the system estimates consumption and generates a corresponding system estimated read. This step is executed from online and batch processing.
•
•
| © 2011 Oracle and/or its affiliates. All Rights Reserved |